FCT TANK Rehabilitation

The problem involved a bridge that was tripped, caused misalignment and stress issues.

 The following tasks were performed to address the issue: 

1- The damaged bridge has been repaired and reconnected to the feed well and other bridge.

2- Damaged ball valves have been replaced.
3- A new frame has been manufactured.
4- The teared rods have been replaced by new ones .
5- New hinges and supports have been supplied and welded by 3-path TIG argon welding to ensure profissional functionallity .
6- All damaged sheets have been restored.
7- 220- ton crane has lifted the tripped bridge and relocated it on its hinges.
8- New hinges, supports and frame have been painted with epoxy coating.
9- The scum box has been pulled back to its location using Blanco.
10- A full cycle dry test has been applied to ensure the tank's functionality.

DAF TANK

Inspection Analysis:

·    Huge failure at DAF tank.
·      Skimmer arms failure.
·      Sludge removal float boxes failure.
·      Weir baffle plates is deformed
·      Some Supports are missed
·      Bolts and anchor are corroded and after inspection we discovered that the material is galvanized steel

Objectives:

  1. 1- Repair the skimmer arms by cutting the bended parts and weld new ones  
    2.      Install the missing supports
    3.      Repair the two float boxes.
    4.      Reassemble the whole parts into place.
    5.      Replace all galvanized bolts and anchors with ST. Steel 304
    6.      Perform the required dry test

pump room installations

Metal installations made of stainless steel pipes and pump chambers used for water lifting.

Motor Mainetanence

Types of motors we work with:
1. Motor
2. Mixers
3. Submersible pumps

Our services include:
Full motor maintenance, which comprises the following scopes:

Electrical Scope:
1. Rewinding
2. Supplying and Installing leakage sensors and temperature sensors
3. Isolating and Heating

Mechanical Scope:
1. Supplying and Installing all original types of mechanical seals, bearings, fans, covers and o-rings.
2. Performing any lathe or screwing work as needed.

Bar Screen Fabrication

Our Teams Managed to fully design and manufacture a full set of four bar screens.

Eltor Police Station & Central Prison

Fire pump station 1500 GPM
Preparing designs, hydraulic calculations, shop drawings, supplying and installing all equipment
required.
Project: - ELTOR police station and prison.
Clint: - Ministry of interior affairs.
Location: - ELTOR EGYPT

Grating for Boiler Room

Fabrication and installation of Grating and its steel structure to reach the upper end of the
boilers for maintenance purpose
The grating is Galvanized steel and is designed to overcome a load of 1 ton

DN 400 Roller

Manufacture and assembly a st.st 304 DN 400 Belt Press Roller,
Our team of skilled engineers and technicians have designed and manufactured this roller to the highest standards of quality and precision, ensuring that it meets the specific needs of our clients.